- 01
Release the substrate after confirming its precise type, condition, expected exposure and protection requirement. Resolve instability, movement, moisture, waterproofing and flatness defects before decorative work.
- 02
Select the substrate-specific primer, receiving layer and any fibreglass reinforcement. Record those decisions in the project QA documents; do not use a universal build-up.
- 03
Measure approximately 300 mL potable water per kg of powder (approximately 6 L for a 20 kg pack). The formula toner is additional: never subtract its volume from the water. Keep water, toner, equipment and mixing time consistent between batches.
- 04
Homogenise the shade-specific Nikkolor toner. Use the sequence water → toner → mix to uniform colour → gradually add powder while mechanically mixing. Scrape the sides and base, then remix to a smooth, homogeneous, lump-free paste.
- 05
Use the mixed material within its approximate 4-hour pot life at +20°C. Never retemper material that has begun to stiffen.
- 06
Apply the substrate-specific primer or receiving layer and allow it to dry as stated in its current TDS. Where Primer Beton is specified, matching or closely matching it to the Cemento 3D colour is recommended, especially on floors, to reduce white chip contrast and assist blending; it does not prevent chips or guarantee an invisible repair.
- 07
Apply the first Cemento 3D coat with a stainless-steel trowel. Allow approximately 12 hours at +20°C, subject to actual drying and the recorded, substrate-appropriate release criterion.
- 08
Apply the second Cemento 3D coat. Allow approximately 24 hours at +20°C before protection, subject to actual drying and the recorded, substrate-appropriate release criterion.
- 09
Finish primarily by controlled trowel compression, with careful hand detailing of corners while the material is workable, and minimise later sanding. Sanding is not a general finishing step. If an isolated detail still requires refinement, wait at least 24 hours at +20°C, then use P150 or P180 only on the affected detail. Trial the method on a sample, preserve thickness, texture, colour and continuity, stop if the coating smears or the abrasive loads, and compatibly extract and remove all dust.
- 10
Owner-approved guidance: without a slip-resistance additive, Decor Finish is only for walls and dry interior floors. Wall exposure, substrate and complete-system restrictions still apply; this is not blanket approval for shower walls or exterior walls. An additive adds slip resistance, but its product name, dosage, tested rating and approved additional uses are unconfirmed. Do not assume an additive approves wet floors, shower floors or exterior use, or establishes an AS 4586 class. Obtain a written project-specific specification for other exposure. PRP remains a separate protection system governed by its own current TDS and project specification. Only for an approved wall exposure or dry interior floor, apply Decor Finish - 3 coats by short-pile roller, allowing approximately 24 hours between coats and 72 hours protected drying after the final coat at +20°C. For white or very light shades, use Semi-Gloss first, then the specified Matte or selected sheen for the remaining coats.
- 11
Protect the completed work. At +20°C, light walkability is approximately 48 hours subject to completed protection and handover controls, hardening approximately 7 days, furniture approximately 10 days and full cure approximately 28 days. After the final Decor coat provide 72 hours protected drying; throughout the first week keep the surface dry, do not clean it and avoid general or preventable traffic. Never drag furniture. Dry does not mean cured. PRP and special-service release instead follow the complete current PRP TDS and project specification.