13-week buyer resource · August–November 2026

A substrate-first guide to choosing, ordering and using microcement.

Thirteen practical chapters for Australian buyers, designers and experienced applicators. Every chapter keeps project conditions, current product information and responsible trade coordination in view.

Evidence standard: no universal build-up, waterproofing, durability or compliance promise is made here. Current product documents and the actual project conditions govern final selection.

Ask about your project

The programme

One useful decision each week.

Week 1 · System selection 28 Aug

Choose a microcement system

Start with the substrate, intended use, exposure and construction details. A finish is selected as part of a compatible project system, not in isolation.

Read the supporting resource
Week 2 · Physical samples 4 Sep

Assess colour, texture and light

View a physical sample beside the project palette, joinery and lighting. Hand-applied mineral finishes naturally need to be judged in person.

Read the supporting resource
Week 3 · Product selection 11 Sep

MicroCem-FB: a substrate-first decision

Confirm the substrate condition and the preparation, reinforcement and protection proposed for the actual location before ordering.

Read the supporting resource
Week 4 · Design specification 18 Sep

Where a textured finish fits

Cemento 3D is an expressive surface option. Suitability still depends on the substrate, use, exposure, detailing and agreed visual direction.

Read the supporting resource
Week 5 · Ordering 25 Sep

Ordering across Australia

Use the live catalogue for current availability, then obtain a freight-inclusive quote when the quantity or destination needs individual review.

Read the supporting resource
Week 6 · Trade supply 2 Oct

An applicator’s pre-order checklist

Experienced applicators should record substrate condition, movement, moisture, transitions, exposure and the complete proposed sequence.

Read the supporting resource
Week 7 · System sequence 9 Oct

Primer, finish and sealer work together

There is no universal sequence for every project. Confirm compatible materials against current product documents and the assessed site conditions.

Read the supporting resource
Week 8 · Training 16 Oct

Choose a practical training pathway

Compare course scope, inclusions, dates and available places against the capability you need to build before taking on a full project.

Read the supporting resource
Week 9 · Material comparison 23 Oct

Microcement and polished concrete are different buys

Compare the substrate, build-up, finish process, project constraints, maintenance and who will install it—not appearance alone.

Read the supporting resource
Week 10 · Bathroom planning 30 Oct

Questions before specifying a bathroom finish

Keep the decorative finish separate from membrane compliance. Coordinate waterproofing, falls, drainage, joints, penetrations and ventilation with the responsible trades.

Read the supporting resource
Week 11 · Trade workflow 6 Nov

A clear trade ordering workflow

Open and verify the account, assess the project, use physical samples, confirm the system, obtain freight and then order against the agreed scope.

Read the supporting resource
Week 12 · Project evidence 13 Nov

From substrate to finished surface

Our project record starts with the real site: substrate, constraints, selected visual direction and the completed owner-supplied photography.

Read the supporting resource
Week 13 · Buyer FAQ 20 Nov

Buyer questions, answered plainly

Find concise answers about selection, samples, ordering, training and project responsibilities, with project-specific limits left intact.

Read the supporting resource

Current evidence before claims

Owner-supplied project photography

Editorial mentions—not paid links